PROJECT DESCRIPTION

Construction of 11 water line with diameter 2500 mm with total of 21,000 m of concrete pipes for the necessity of transporting water from the eastern source of Mostakbal Masr Project with total cost 1,030,000,000 Billion.

PROJECT DETAIL

  • Client: Egyptian Armed Forces Engineering Authority
  • Implementation Period: 10 months
  • Total Cost: 1,030,000,000 Billion