PROJECT DESCRIPTION
Construction of 11 water line with diameter 2500 mm with total of 21,000 m of concrete pipes for the necessity of transporting water from the eastern source of Mostakbal Masr Project with total cost 1,030,000,000 Billion.
PROJECT DETAIL
- Client: Egyptian Armed Forces Engineering Authority
- Implementation Period: 10 months
- Total Cost: 1,030,000,000 Billion